American Concrete to install Old Hardin Road sidewalk

Originally published in the 6/8/18 print edition of Yellowstone County News.

LOCKWOOD — The Lockwood Pedestrian Safety District has awarded the project to build a sidewalk on Old Hardin Road to American Concrete, which had the lowest bid of $288,848.20, of five bids received for the project.

The project involves the construction of 4000 lineal feet of a six-foot wide concrete sidewalk, which includes installing a drain culvert, highway striping/signing and media modifications, and associated earthwork.

The county is also issuing, this week, a request for proposal for a carnival operator for MontanaFair, for a five-year period, beginning in … Read full story by subscribing here or call the Yellowstone County News.  

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.